
Add to Cart
19'' Open rack Cabinet,18U Server Rack,frame Open Rack 2post open frame rack
Package:
Features:
1.Modular design, easily assemble and disassemble for delivery, low-cost.
2.Various optional accessories according to requirements (cable management slot, cable management, removable working panel, etc.)
3.19’ frame 2 pcs, 2mm welded fold steel sheet, two sides figure punching.
4.Can be bolted directly to floor
5.Maximum access for cable management and equipment maintenance.
6.Flexible packing methods allows for convenient stocking and end user delivery.
Standard and Material:
Comply with ANSI/EIA RS-310-D,IEC297-2,DIN41494;PART1,DIN41494;PART7,ETSI standard.
Main material:SPCC cold rolled steel or EG steel
Thickness:Plinth:2.0mm;Front and bottom beams 2.0mm, pole:1.5mm.
Surface Finish:Degreasing, pickling, phosphoric, power coated.
Loading capacity: Static loading: 200KG, from 15U to 47U capacity.
part No. | Width | Depth | (U) | Height |
T-OR01-6618 | 560 | 600 | 18 | 1003 |
T-OR01-6622 | 560 | 600 | 22 | 1181 |
T-OR01-6627 | 560 | 600 | 27 | 1403 |
T-OR01-6632 | 560 | 600 | 32 | 1625 |
T-OR01-6637 | 560 | 600 | 37 | 1848 |
T-OR01-6642 | 560 | 600 | 42 | 2070 |
T-OR01-6645 | 560 | 600 | 45 | 2204 |
T-OR01-6647 | 560 | 600 | 47 | 2292 |
OUR SERVICE:
1.About shipping: ningbo or shanghai, Send to your warehouse or your other supplier in China. | |||
2.About Payment: T/T, Western Union; LC; Paypal, 30% deposit 70% before shippment. | |||
3.About QC: Strict quality control system | |||
4.About delivery time: 10-15 days |
FAQ:
1.Q:Are you a factory or trading company? | |||||
A:We are a Factory, Distributor and Trading Company. | |||||
2.Q:Where is your factory located? How can I visit there? | |||||
A:Our factory and office is located in Ningbo, China. | |||||
You can fly to Ningbo or Shanghai airport,Warmly welcome to visit us! | |||||
3.Q:Can you do OEM? | |||||
A:Sure,we can do OEM products. | |||||
4.Q:How can I get some samples? | |||||
A:We are honored to offer you samples. | |||||
5.Q:How does your factory promise quality control? | |||||
A:Quality is priority.We always attach great importance to quality | |||||
controlling.Our factory has gained CE,ROHS,EMC authentication. |